Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,895
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0922 # 01 Y:2024 | 01 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,132 | $1,000 | n/a |
AM0922 # 03 Y:2024 | 03 | 2024 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $5,297 | $100 | n/a |
AM0922 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $43,580 | $884,520 | n/a |
AM0922 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $708 | $9,870 | n/a |
AM0921 # 01 Y:2024 | 01 | 2024 | REDUCE FLUID FLOW RATES | $787 | $3,000 | n/a |
AM0914 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,515 | $0 | n/a |
AM0921 # 03 Y:2024 | 03 | 2024 | REPAIR FAULTY LOUVERS AND DAMPERS | $2,461 | $6,000 | n/a |
AM0914 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,190 | $2,260 | n/a |
AM0921 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,420 | $260,520 | n/a |
AM0921 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $218 | $3,540 | n/a |
AM0914 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,310 | $0 | n/a |
AM0914 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $40,720 | $77,840 | n/a |
AM0913 # 01 Y:2024 | 01 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $206,260 | $1,610,000 | n/a |
AM0920 # 05 Y:2024 | 05 | 2024 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,403 | $1,000 | n/a |
AM0920 # 01 Y:2024 | 01 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $903 | $35,477 | n/a |
AM0913 # 08 Y:2024 | 08 | 2024 | INSULATE BARE EQUIPMENT | $2,610 | $415 | n/a |
AM0913 # 04 Y:2024 | 04 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $12,600 | $2,200 | n/a |
AM0913 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,090 | $0 | n/a |
AM0913 # 02 Y:2024 | 02 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $430,200 | $10,000 | n/a |
AM0920 # 04 Y:2024 | 04 | 2024 | REPAIR FAULTY LOUVERS AND DAMPERS | $4,125 | $9,000 | n/a |
AM0913 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $10,340 | $19,040 | n/a |
AM0920 # 03 Y:2024 | 03 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $6,640 | $7,500 | n/a |
AM0920 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $20,630 | $460,200 | n/a |
AM0913 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $48,970 | $2,000 | n/a |
AM0913 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,000 | $15 | n/a |