IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

148

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0092 # 03 Y:2016 03 2016 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,842 $464 Not Implemented
BS0092 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $12,593 $2,530 Not Implemented
BS0092 # 04 Y:2016 04 2016 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,190 $6,640 Not Implemented
BS0092 # 01 Y:2016 01 2016 USE EXISTING DAM TO GENERATE ELECTRICITY $84,096 $646,400 Not Implemented
BS0092 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,692 $3,161 Not Implemented
BS0092 # 06 Y:2016 06 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,891 $3,900 Not Implemented
BS0090 # 07 Y:2016 07 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $30 $15 Not Implemented
BS0090 # 04 Y:2016 04 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $942 $1,373 Implemented
BS0090 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $283 $274 Not Implemented
BS0090 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $2,027 $1,820 Implemented
BS0090 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,391 $2,653 Implemented
BS0090 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $395 $254 Implemented
BS0090 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,077 $2,600 Not Implemented
BS0089 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,615 $4,480 Not Implemented
BS0089 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,610 $15,011 Not Implemented
BS0089 # 01 Y:2016 01 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,075 $353 Not Implemented
BS0089 # 06 Y:2016 06 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $5,303 $1,200 Not Implemented
BS0089 # 07 Y:2016 07 2016 OPTIMIZE PLANT POWER FACTOR $15,910 $115,903 Not Implemented
BS0089 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,760 $4,580 Not Implemented
BS0089 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,855 $654 Not Implemented
BS0089 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $7,566 $6,400 Not Implemented
BS0088 # 02 Y:2016 02 2016 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) $64,374 $480 Not Implemented
BS0088 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,994 $29,692 Not Implemented
BS0088 # 01 Y:2016 01 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $7,541 $11,782 Not Implemented
BS0087 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $689 $5,040 Not Implemented