IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0746 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $25,082 $120,593 n/a
CO0746 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $415 $0 n/a
CO0746 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $238 $279 n/a
CO0746 # 01 Y:2022 01 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $12,559 $7,100 n/a
CO0745 # 04 Y:2022 04 2022 USE SOLAR HEAT FOR HEAT $75,255 $445,900 n/a
CO0745 # 03 Y:2022 03 2022 USE OPTIMUM TEMPERATURE $10,067 $0 n/a
CO0745 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,752 $0 n/a
CO0745 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $1,180 $0 n/a
CO0744 # 06 Y:2022 06 2022 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $60,192 $4,219 n/a
CO0744 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,731 $3,276 n/a
CO0744 # 05 Y:2022 05 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $210,000 $58,000 n/a
CO0744 # 04 Y:2022 04 2022 INSTALL SPECTRAL REFLECTORS / DELAMP $1,847 $9,768 n/a
CO0744 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,175 $7,076 n/a
CO0744 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $881 $2,407 n/a
CO0744 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $26,159 $136,687 n/a
CO0743 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $9,876 $84,276 n/a
CO0743 # 05 Y:2022 05 2022 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $7,800 $26,000 n/a
CO0743 # 04 Y:2022 04 2022 RECOVER AND REUSE WASTE MATERIAL $1,718 $4,820 n/a
CO0743 # 03 Y:2022 03 2022 INSTALL SPECTRAL REFLECTORS / DELAMP $2,506 $9,960 n/a
CO0743 # 02 Y:2022 02 2022 USE HEAT PUMP FOR SPACE CONDITIONING $9,304 $42,082 n/a