Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
329
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0061 # 03 Y:2010 | 03 | 2010 | DISCONNECT BALLASTS | $655 | $5,000 | Implemented |
DL0061 # 04 Y:2010 | 04 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,400 | $5,200 | Not Implemented |
DL0061 # 05 Y:2010 | 05 | 2010 | ADD AREA LIGHTING SWITCHES | $23,365 | $120 | Implemented |
DL0061 # 06 Y:2010 | 06 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $414 | $440 | Implemented |
DL0061 # 07 Y:2010 | 07 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,800 | $2,400 | Not Implemented |
DL0061 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $246 | $400 | Not Implemented |
DL0061 # 09 Y:2010 | 09 | 2010 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $438 | $1,100 | Not Implemented |
DL0061 # 10 Y:2010 | 10 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,529 | $47,000 | Implemented |
DL0061 # 11 Y:2010 | 11 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,440 | $13,400 | Not Implemented |
DL0061 # 12 Y:2010 | 12 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,690 | $5,550 | Not Implemented |
DL0061 # 13 Y:2010 | 13 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $860 | $8,000 | Not Implemented |
DL0061 # 14 Y:2010 | 14 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,396 | $20,804 | Implemented |
DL0055 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $31,870 | $13,000 | Not Implemented |
DL0055 # 02 Y:2010 | 02 | 2010 | REPLACE BOILER | $59,500 | $102,000 | Not Implemented |
DL0055 # 03 Y:2010 | 03 | 2010 | OPERATE BOILERS ON HIGH FIRE SETTING | $35,000 | $50 | Not Implemented |
DL0055 # 04 Y:2010 | 04 | 2010 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $39,150 | $100,000 | Not Implemented |
DL0055 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $82,808 | $125,000 | Implemented |
DL0055 # 06 Y:2010 | 06 | 2010 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $9,000 | $3,000 | Implemented |
DL0055 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,600 | $1,200 | Implemented |
DL0055 # 08 Y:2010 | 08 | 2010 | REDUCE VENTILATION AIR | $21,000 | $15,000 | Not Implemented |
DL0055 # 09 Y:2010 | 09 | 2010 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $23,200 | $15,000 | Not Implemented |
DL0055 # 10 Y:2010 | 10 | 2010 | KEEP EQUIPMENT CLEAN | $3,631 | $500 | Implemented |
DL0055 # 11 Y:2010 | 11 | 2010 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $3,631 | $1,830 | Implemented |
DL0055 # 12 Y:2010 | 12 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,467 | $6,000 | Implemented |
DL0055 # 13 Y:2010 | 13 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,935 | $2,840 | Not Implemented |