IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

128

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0078 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,872 $165,720 Not Implemented
DL0078 # 07 Y:2011 07 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $77,835 $42,650 Implemented
DL0078 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,553 $42,800 Not Implemented
DL0078 # 01 Y:2011 01 2011 REPLACE BOILER $123,207 $900,000 Not Implemented
DL0078 # 06 Y:2011 06 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $14,637 $800 Not Implemented
DL0078 # 02 Y:2011 02 2011 USE RADIANT HEATER FOR SPOT HEATING $191,452 $500,000 Not Implemented
DL0078 # 08 Y:2011 08 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $23,761 $22,500 Not Implemented
DL0078 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,285 $28,500 Not Implemented
DL0079 # 06 Y:2011 06 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,695 $26,400 Not Implemented
DL0079 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,495 $36,850 Implemented
DL0079 # 04 Y:2011 04 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,364 $1,015 Implemented
DL0079 # 08 Y:2011 08 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $464 $105 Implemented
DL0079 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,317 $350 Implemented
DL0079 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,207 $27,090 Not Implemented
DL0079 # 03 Y:2011 03 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,737 $100 Implemented
DL0079 # 09 Y:2011 09 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $306 $360 Not Implemented
DL0079 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,834 $15,000 Not Implemented
DL0077 # 04 Y:2011 04 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $31,497 $800 Not Implemented
DL0077 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $119,680 $350,000 Implemented
DL0077 # 08 Y:2011 08 2011 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,717 $900 Not Implemented
DL0077 # 05 Y:2011 05 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $21,318 $1,600 Implemented
DL0077 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,771 $11,600 Implemented
DL0077 # 01 Y:2011 01 2011 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $20,592 $3,200 Not Implemented
DL0077 # 03 Y:2011 03 2011 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $63,615 $100,500 Not Implemented
DL0077 # 06 Y:2011 06 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $24,600 $18,000 Not Implemented