IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,839

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0938 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $1,868 $1,016 Not Implemented
GT0938 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,814 $18,557 Implemented
GT0938 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $190 $512 Not Implemented
GT0938 # 06 Y:2019 06 2019 AIR CONDITION ONLY SPACE NECESSARY $213 $590 Not Implemented
GT0937 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $1,362 $310 Implemented
GT0937 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,545 $4,311 Implemented
GT0937 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $10,618 $38,920 Not Implemented
GT0937 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $32,772 $100,000 Not Implemented
GT0937 # 05 Y:2019 05 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $17,740 $158,500 Not Implemented
GT0936 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $24,628 $2,456 Implemented
GT0936 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,484 $2,000 Implemented
GT0936 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,073 $3,500 Implemented
GT0936 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,634 $19,362 Implemented
GT0936 # 05 Y:2019 05 2019 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,489 $1,020 Not Implemented
GT0936 # 06 Y:2019 06 2019 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $19,169 $14,400 Not Implemented
GT0936 # 07 Y:2019 07 2019 BURN A LESS EXPENSIVE GRADE OF FUEL $9,120 $9,016 Implemented
GT0936 # 08 Y:2019 08 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $96,885 $235,465 Not Implemented
GT0935 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,640 $15,569 Not Implemented
GT0935 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $154 $260 Implemented
GT0935 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $396 $1,444 Not Implemented
GT0935 # 04 Y:2019 04 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $6,579 $75,597 Not Implemented
GT0934 # 01 Y:2019 01 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,153 $250 Implemented
GT0934 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $2,334 $1,238 Implemented
GT0934 # 03 Y:2019 03 2019 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $9,210 $19,899 Not Implemented
GT0934 # 04 Y:2019 04 2019 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $305,911 $903,775 Not Implemented