IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0362 # 03 Y:1988 03 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $2,770 $2,770 Implemented
GT0362 # 04 Y:1988 04 1988 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,800 $8,200 Implemented
GT0362 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,340 $3,300 Implemented
GT0362 # 06 Y:1988 06 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,500 $3,500 Implemented
GT0362 # 07 Y:1988 07 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $215 $146 Implemented
GT0362 # 08 Y:1988 08 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $18 $0 Implemented
GT0363 # 01 Y:1988 01 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,945 $200 Not Implemented
GT0363 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $380 $370 Not Implemented
GT0363 # 03 Y:1988 03 1988 AIR CONDITION ONLY SPACE NECESSARY $930 $840 Not Implemented
GT0363 # 04 Y:1988 04 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $12,120 $4,685 Not Implemented
GT0363 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $472 $377 Not Implemented
GT0363 # 06 Y:1988 06 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $66,800 $45,607 Not Implemented
GT0363 # 07 Y:1988 07 1988 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,540 $32,000 Not Implemented
GT0363 # 08 Y:1988 08 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $163 $150 Not Implemented
GT0354 # 01 Y:1988 01 1988 INSTALL SET-BACK TIMERS $10,948 $1,800 Not Implemented
GT0354 # 02 Y:1988 02 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,524 $10,400 Not Implemented
GT0354 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,340 $5,950 Not Implemented
GT0354 # 04 Y:1988 04 1988 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $25,532 $80,640 Not Implemented
GT0355 # 01 Y:1988 01 1988 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,437 $7,830 Not Implemented
GT0355 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $535 $300 Implemented
GT0355 # 03 Y:1988 03 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $702 $85 Implemented
GT0355 # 04 Y:1988 04 1988 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $136 $140 Not Implemented
GT0355 # 05 Y:1988 05 1988 USE RADIANT HEATER FOR SPOT HEATING $11,594 $25,480 Implemented
GT0344 # 01 Y:1988 01 1988 TURN OFF EQUIPMENT WHEN NOT IN USE $37,911 $21,000 Not Implemented
GT0344 # 02 Y:1988 02 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,970 $2,830 Not Implemented