IAC Assessment: GT0375
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0375
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1989
Principal Product SOFT DRINKS
NAICS n/a
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 13,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $270,830 4,279,895 kWh $0.06
Natural Gas $86,001 18,337 MMBtu $4.69
TOTAL ENERGY COSTS $356,831
RECOMMENDED SAVINGS* $28,937 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,197
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$6,400
Cost:
$2,350
- - $400 85 $6,000 - -
-
kWh
$400
85
MMBtu
$6,000
-
$
02: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$2,289
Cost:
$2,366
$704 11,137 $1,585 339 - - $704
11,137
kWh
$1,585
339
MMBtu
-
-
$
03: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$17,740
Cost:
$37,400
- - $17,740 3,790 - - -
-
kWh
$17,740
3,790
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$90
Cost:
$206
$90 1,465 - - - - $90
1,465
kWh
-
-
MMBtu
-
-
$
05: 2.5193 CONVERT FROM BATCH TO CONTINUOUS OPERATION Savings:
$988
Cost:
$1,078
$988 15,826 - - - - $988
15,826
kWh
-
-
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,430
Cost:
$500
- - $1,730 370 $(-300) - -
-
kWh
$1,730
370
MMBtu
$(-300)
-
$
TOTAL RECOMMENDED Savings:
$28,937
Cost:
$43,900
$1,782 28,428 $21,455 4,584 $5,700 - $1,782
28,428
kWh
$21,455
4,584
MMBtu
$5,700
-
$
TOTAL IMPLEMENTED Savings:
$11,197
Cost:
$6,500
$1,782 28,428 $3,715 794 $5,700 - $1,782
28,428
kWh
$3,715
794
MMBtu
$5,700
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes