5,741
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0115 # 03 Y:1982 | 03 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $558 | $1,440 | Not Implemented |
GT0116 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,021 | $400 | Implemented |
GT0116 # 02 Y:1982 | 02 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,712 | $0 | Implemented |
GT0116 # 03 Y:1982 | 03 | 1982 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $1,841 | $0 | Implemented |
GT0116 # 04 Y:1982 | 04 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,272 | $150 | Implemented |
GT0117 # 01 Y:1982 | 01 | 1982 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,518 | $2,760 | Not Implemented |
GT0117 # 02 Y:1982 | 02 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $7,669 | $5,792 | Not Implemented |
GT0117 # 03 Y:1982 | 03 | 1982 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $7,298 | $1,500 | Not Implemented |
GT0117 # 04 Y:1982 | 04 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $310 | $500 | Not Implemented |
GT0118 # 01 Y:1982 | 01 | 1982 | AIR CONDITION ONLY SPACE NECESSARY | $5,952 | $573 | Not Implemented |
GT0118 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,187 | $608 | Not Implemented |
GT0118 # 04 Y:1982 | 04 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,676 | $198 | Not Implemented |
GT0125 # 01 Y:1982 | 01 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,931 | $1,900 | Implemented |
GT0125 # 02 Y:1982 | 02 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,067 | $400 | Implemented |
GT0125 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,124 | $6,215 | Implemented |
GT0125 # 04 Y:1982 | 04 | 1982 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $648 | $0 | Implemented |
GT0125 # 05 Y:1982 | 05 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $748 | $359 | Implemented |
GT0112 # 01 Y:1982 | 01 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,062 | $2,400 | Implemented |
GT0112 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $973 | $506 | Implemented |
GT0112 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,411 | $5,029 | Implemented |
GT0112 # 04 Y:1982 | 04 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,125 | $1,500 | Implemented |
GT0112 # 05 Y:1982 | 05 | 1982 | USE OPTIMUM THICKNESS INSULATION | $3,585 | $5,294 | Implemented |
GT0112 # 06 Y:1982 | 06 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,835 | $0 | Implemented |
GT0112 # 07 Y:1982 | 07 | 1982 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $656 | $0 | Implemented |
GT0112 # 08 Y:1982 | 08 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $27,024 | $31,500 | Implemented |