IAC logo
IAC Assessment: GT0166
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0166
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1983
Principal Product AUTOMOBILE MOULDING
NAICS n/a
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 156
Plant Area (Sq.Ft.) 0
Annual Production 10,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $157,813 2,390,387 kWh $0.07
Natural Gas $54,396 11,263 MMBtu $4.83
TOTAL ENERGY COSTS $212,209
RECOMMENDED SAVINGS* $37,111 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2514 COVER OPEN TANKS Savings:
$15,260
Cost:
$6,300
- - $15,260 3,160 -
-
kWh
$15,260
3,160
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,800
Cost:
$21,480
$7,800 118,113 - - $7,800
118,113
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,300
Cost:
$4,538
$6,300 95,545 - - $6,300
95,545
kWh
-
-
MMBtu
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,570
Cost:
$200
$(-330) (-4,982) $4,900 1,014 $(-330)
(-4,982)
kWh
$4,900
1,014
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,811
Cost:
$500
- - $1,811 375 -
-
kWh
$1,811
375
MMBtu
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,370
Cost:
$127
$145 2,052 $1,225 254 $145
2,052
kWh
$1,225
254
MMBtu
TOTAL RECOMMENDED Savings:
$37,111
Cost:
$33,145
$13,915 210,728 $23,196 4,803 $13,915
210,728
kWh
$23,196
4,803
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas