IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,675

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0211 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,520 $15,297 Implemented
HO0211 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,114 $9,233 Implemented
HO0211 # 03 Y:1999 03 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,289 $1,500 Implemented
HO0211 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,364 $20 Implemented
HO0211 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $900 $2,000 Implemented
HO0211 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,539 $200 Implemented
HO0211 # 07 Y:1999 07 1999 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $969 $1,400 Not Implemented
HO0211 # 08 Y:1999 08 1999 USE COMPRESSOR AIR FILTERS $6,130 $150 Implemented
HO0211 # 09 Y:1999 09 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,690 $1,400 Not Implemented
HO0211 # 10 Y:1999 10 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $15,600 $480 Implemented
HO0210 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,153 $13,162 Not Implemented
HO0210 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $22,250 $28,000 Not Implemented
HO0210 # 03 Y:1999 03 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $26,892 $1,200 Not Implemented
HO0210 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,850 $3,667 Not Implemented
HO0210 # 05 Y:1999 05 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,190 $1,500 Not Implemented
HO0210 # 06 Y:1999 06 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $50,969 $43,100 Not Implemented
HO0210 # 07 Y:1999 07 1999 CHANGE OPERATING CONDITIONS $15,421 $500 Not Implemented
HO0210 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,740 $180 Not Implemented
HO0210 # 09 Y:1999 09 1999 MODIFY MATERIAL APPLICATION METHODS $13,353 $0 Not Implemented
HO0210 # 10 Y:1999 10 1999 REDUCE OR ELIMINATE WASTE $29,674 $5,000 Not Implemented
HO0210 # 11 Y:1999 11 1999 INSTALL SHROUDING ON MACHINES TO PREVENT SPLASHING $15,834 $6,000 Not Implemented
HO0209 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,002 $55,668 Not Implemented
HO0209 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $1,005 $1,600 Implemented
HO0209 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,540 $570 Implemented
HO0209 # 04 Y:1999 04 1999 USE OPTIMUM THICKNESS INSULATION $24,609 $13,620 Not Implemented