IAC logo
IAC Assessment: HO0211
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0211
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1999
Principal Product Aluminum Extrusions
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 110,000
Annual Production 22,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $432,347 11,433,177 kWh $0.04
Electricity Demand $91,385 11,310 kW-months/year $8.08
Electricity Fees $(-54,546) - $ -
Natural Gas $155,160 34,446 MMBtu $4.50
TOTAL ENERGY COSTS $624,346
RECOMMENDED SAVINGS* $43,115 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,456
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,520
Cost:
$15,297
$2,630 69,754 $1,890 234 - - - - $2,630
69,754
kWh
$1,890
234
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,114
Cost:
$9,233
$4,114 435,522 - - - - - - $4,114
435,522
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,289
Cost:
$1,500
$1,622 42,790 $667 83 - - - - $1,622
42,790
kWh
$667
83
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,364
Cost:
$20
$967 25,498 $397 49 - - - - $967
25,498
kWh
$397
49
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$900
Cost:
$2,000
$638 16,999 $262 33 - - - - $638
16,999
kWh
$262
33
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,539
Cost:
$200
$4,539 22,860 - - - - - - $4,539
22,860
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4238 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING Savings:
$969
Cost:
$1,400
$969 25,498 - - - - - - $969
25,498
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$6,130
Cost:
$150
$6,130 178,195 - - - - - - $6,130
178,195
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,690
Cost:
$1,400
- - - - $2,690 598 - - -
-
kWh
-
-
kW-months/year
$2,690
598
MMBtu
-
-
$
10: 4.1140 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$15,600
Cost:
$480
- - - - - - $15,600 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,600
-
$
TOTAL RECOMMENDED Savings:
$43,115
Cost:
$31,680
$21,609 817,116 $3,216 399 $2,690 598 $15,600 - $21,609
817,116
kWh
$3,216
399
kW-months/year
$2,690
598
MMBtu
$15,600
-
$
TOTAL IMPLEMENTED Savings:
$39,456
Cost:
$28,880
$20,640 791,618 $3,216 399 - - $15,600 - $20,640
791,618
kWh
$3,216
399
kW-months/year
-
-
MMBtu
$15,600
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost