IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

432

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0557 # 10 Y:2016 10 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $420 $398 Not Implemented
IA0557 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $461 $35 Implemented
IA0557 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $553 $242 Implemented
IA0557 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,648 $189 Implemented
IA0557 # 06 Y:2016 06 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $2,719 $5,030 Implemented
IA0557 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $3,284 $5,488 Not Implemented
IA0557 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $4,037 $4,835 Not Implemented
IA0557 # 03 Y:2016 03 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,367 $29,084 Not Implemented
IA0557 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,548 $500 Not Implemented
IA0557 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,271 $95,210 Not Implemented
IA0546 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,451 $5,839 Implemented
IA0546 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,361 $6,263 Implemented
IA0546 # 02 Y:2015 02 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,907 $7,104 Implemented
IA0546 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $463 Implemented
IA0546 # 05 Y:2015 05 2015 SHUT OFF PILOTS IN STANDBY EQUIPMENT $814 $60 Implemented
IA0546 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $419 $539 Implemented
IA0546 # 07 Y:2015 07 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $229 $371 Implemented
IA0545 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,509 $115,341 Implemented
IA0545 # 01 Y:2015 01 2015 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $37,834 $27,000 Implemented
IA0545 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $9,979 $4,778 Not Implemented
IA0545 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,267 $4,620 Implemented
IA0545 # 06 Y:2015 06 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $231 $292 Implemented
IA0545 # 04 Y:2015 04 2015 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,172 $620 Implemented
IA0529 # 02 Y:2015 02 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,154 $7,444 Implemented
IA0529 # 03 Y:2015 03 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $214 $284 Implemented