IAC Assessment: IA0557
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2016
Principal Product cereal
NAICS 311230 - Breakfast Cereal Manufacturing
SIC 2043 - Cereal Breakfast Foods
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 143,000
Annual Production 17,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,616 4,192,500 kWh $0.03
Electricity Demand $182,057 9,120 kW-months/year $19.96
Natural Gas $245,108 46,672 MMBtu $5.25
TOTAL ENERGY COSTS $533,781
RECOMMENDED SAVINGS* $64,308 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,381
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$44,271
Cost:
$95,210
$19,952 788,611 $24,319 1,218 - - - - $19,952
788,611
kWh
$24,319
1,218
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,548
Cost:
$500
$743 29,386 $805 40 - - - - $743
29,386
kWh
$805
40
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,367
Cost:
$29,084
$2,371 93,717 $2,996 150 - - - - $2,371
93,717
kWh
$2,996
150
kW-months/year
-
-
$
-
-
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,037
Cost:
$4,835
- - - - $4,037 - - - -
-
kWh
-
-
kW-months/year
$4,037
-
$
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,284
Cost:
$5,488
$3,284 129,808 - - - - - - $3,284
129,808
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,719
Cost:
$5,030
- - - - - - $2,719 518 -
-
kWh
-
-
kW-months/year
-
-
$
$2,719
518
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,648
Cost:
$189
$793 31,273 $855 43 - - - - $793
31,273
kWh
$855
43
kW-months/year
-
-
$
-
-
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$553
Cost:
$242
- - - - - - $553 105 -
-
kWh
-
-
kW-months/year
-
-
$
$553
105
MMBtu
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$461
Cost:
$35
$222 8,760 $239 12 - - - - $222
8,760
kWh
$239
12
kW-months/year
-
-
$
-
-
MMBtu
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$420
Cost:
$398
$171 6,829 $249 12 - - - - $171
6,829
kWh
$249
12
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$64,308
Cost:
$141,011
$27,536 1,088,384 $29,463 1,476 $4,037 - $3,272 623 $27,536
1,088,384
kWh
$29,463
1,476
kW-months/year
$4,037
-
$
$3,272
623
MMBtu
TOTAL IMPLEMENTED Savings:
$5,381
Cost:
$5,496
$1,015 40,033 $1,094 55 - - $3,272 623 $1,015
40,033
kWh
$1,094
55
kW-months/year
-
-
$
$3,272
623
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas