IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0567 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,409 $75,175 Not Implemented
IA0567 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,604 $8,596 Not Implemented
IA0567 # 05 Y:2016 05 2016 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $1,259 $500 Not Implemented
IA0567 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,956 $7,888 Not Implemented
IA0567 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,535 $1,320 Not Implemented
IA0566 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $592 $70 Implemented
IA0566 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,279 $6,724 Implemented
IA0566 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $3,889 $5,100 Implemented
IA0566 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,966 $195 Implemented
IA0566 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,660 $6,945 Implemented
IA0566 # 06 Y:2016 06 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,284 $1,000 Implemented
IA0566 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,976 $49,834 Implemented
IA0552 # 08 Y:2016 08 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $886 $357 Implemented
IA0552 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,982 $104,231 Implemented
IA0552 # 04 Y:2016 04 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,573 $1 Implemented
IA0552 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $4,046 $2,600 Implemented
IA0552 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,216 $390 Implemented
IA0552 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,488 $35 Not Implemented
IA0552 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,487 $35 Not Implemented
IA0552 # 05 Y:2016 05 2016 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,612 $280 Not Implemented
IA0528 # 01 Y:2014 01 2014 HEAT WATER WITH EXHAUST HEAT $14,601 $9,600 Not Implemented
IA0528 # 06 Y:2014 06 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,974 $1,053 Not Implemented
IA0528 # 04 Y:2014 04 2014 USE PHOTOCELL CONTROLS $2,865 $630 Not Implemented
IA0528 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $9,196 $7,095 Not Implemented
IA0528 # 07 Y:2014 07 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $408 $970 Not Implemented