Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,484
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0316 # 10 Y:2025 | 10 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $525 | $205 | n/a |
IC0316 # 12 Y:2025 | 12 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,025 | $1,615 | n/a |
IC0316 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $93 | $379 | n/a |
IC0316 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,822 | $728 | n/a |
IC0316 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $89,150 | $489,314 | n/a |
IC0316 # 09 Y:2025 | 09 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,406 | $3,393 | n/a |
IC0316 # 11 Y:2025 | 11 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,060 | $0 | n/a |
IC0316 # 08 Y:2025 | 08 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,349 | $3,386 | n/a |
IC0316 # 07 Y:2025 | 07 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $21,124 | $3,628 | n/a |
IC0316 # 13 Y:2025 | 13 | 2025 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $926 | $1,541 | n/a |
IC0316 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,450 | $3,794 | n/a |
IC0316 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,039 | $346 | n/a |
IC0316 # 14 Y:2025 | 14 | 2025 | REPLACE BOILER | $36,754 | $57,900 | n/a |
IC0316 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $198 | $144 | n/a |
IC0315 # 09 Y:2024 | 09 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,224 | $0 | n/a |
IC0315 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,069 | $442 | n/a |
IC0315 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,959 | $820 | n/a |
IC0315 # 07 Y:2024 | 07 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,991 | $7,497 | n/a |
IC0315 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $525 | $242 | n/a |
IC0315 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,133 | $1,850 | n/a |
IC0315 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,478 | $227 | n/a |
IC0315 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $82,148 | $379,057 | n/a |
IC0315 # 10 Y:2024 | 10 | 2024 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $369,968 | $14,366 | n/a |
IC0315 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $6,223 | $2,225 | n/a |
IC0315 # 11 Y:2024 | 11 | 2024 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $12,134 | $7,693 | n/a |