Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,899
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0328 # 03 Y:2025 | 03 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $239 | $0 | n/a |
IC0328 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $244 | $694 | n/a |
IC0328 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $101,072 | $435,474 | n/a |
IC0328 # 05 Y:2025 | 05 | 2025 | USE EXISTING DAM TO GENERATE ELECTRICITY | $6,679 | $33,300 | n/a |
IC0328 # 02 Y:2025 | 02 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $82,241 | $385,393 | n/a |
IC0326 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,821 | $4,859 | n/a |
IC0326 # 01 Y:2025 | 01 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $9,345 | $13,327 | n/a |
IC0326 # 10 Y:2025 | 10 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $93 | $0 | n/a |
IC0326 # 06 Y:2025 | 06 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $657 | $3,632 | n/a |
IC0326 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $393 | $1,089 | n/a |
IC0326 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,819 | $678 | n/a |
IC0326 # 07 Y:2025 | 07 | 2025 | INSULATE BARE EQUIPMENT | $2,266 | $2,982 | n/a |
IC0326 # 09 Y:2025 | 09 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $941 | $0 | n/a |
IC0326 # 08 Y:2025 | 08 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $15,398 | $114,881 | n/a |
IC0326 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $440 | $0 | n/a |
IC0325 # 02 Y:2025 | 02 | 2025 | INSTALL EFFICIENT RECTIFIERS | $8,079 | $8,129 | n/a |
IC0325 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $34,094 | $58,119 | n/a |
IC0325 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,318 | $7,240 | n/a |
IC0325 # 11 Y:2025 | 11 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $149 | $144 | n/a |
IC0325 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,350 | $246 | n/a |
IC0325 # 07 Y:2025 | 07 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $2,149 | $5,256 | n/a |
IC0325 # 09 Y:2025 | 09 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,137 | $0 | n/a |
IC0325 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,138 | $5,309 | n/a |
IC0325 # 05 Y:2025 | 05 | 2025 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $4,795 | $3,414 | n/a |
IC0325 # 08 Y:2025 | 08 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,716 | $0 | n/a |