Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,848
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0320 # 15 Y:2025 | 15 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $42,252 | $8,172 | n/a |
IC0319 # 01 Y:2025 | 01 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,393 | $16,567 | n/a |
IC0319 # 02 Y:2025 | 02 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,099 | $14,469 | n/a |
IC0319 # 03 Y:2025 | 03 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $8,428 | $0 | n/a |
IC0319 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,018 | $5,197 | n/a |
IC0319 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $275 | $0 | n/a |
IC0319 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $2,117 | $2,486 | n/a |
IC0319 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $295 | $481 | n/a |
IC0319 # 08 Y:2025 | 08 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,088 | $20,716 | n/a |
IC0319 # 09 Y:2025 | 09 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,027 | $0 | n/a |
IC0319 # 10 Y:2025 | 10 | 2025 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $4,445 | $3,414 | n/a |
IC0319 # 11 Y:2025 | 11 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $33,790 | $16,614 | n/a |
IC0319 # 12 Y:2025 | 12 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $1,597 | $5,347 | n/a |
IC0319 # 13 Y:2025 | 13 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $799 | $519 | n/a |
IC0318 # 01 Y:2025 | 01 | 2025 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $11,344 | $4,184 | n/a |
IC0318 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,649 | $4,909 | n/a |
IC0318 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $833 | $781 | n/a |
IC0318 # 04 Y:2025 | 04 | 2025 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $1,776,306 | $9,581,351 | n/a |
IC0318 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,255 | $8,951 | n/a |
IC0318 # 06 Y:2025 | 06 | 2025 | REPLACE BOILER | $133,316 | $376,143 | n/a |
IC0318 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $2,756 | $391 | n/a |
IC0318 # 08 Y:2025 | 08 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $688 | $63 | n/a |
IC0318 # 09 Y:2025 | 09 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $62,936 | $159,045 | n/a |
IC0318 # 10 Y:2025 | 10 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $74,545 | $10,174 | n/a |
IC0318 # 11 Y:2025 | 11 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,250 | $1,159 | n/a |