Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,848
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0324 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,110 | $1,610 | n/a |
IC0324 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $898 | $3,747 | n/a |
IC0324 # 04 Y:2025 | 04 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,112 | $1,626 | n/a |
IC0324 # 06 Y:2025 | 06 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $19,325 | $143,593 | n/a |
IC0324 # 07 Y:2025 | 07 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,575 | $44,208 | n/a |
IC0324 # 02 Y:2025 | 02 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,773 | $11,878 | n/a |
IC0324 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,101 | $294,166 | n/a |
IC0323 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $47,182 | $233,599 | n/a |
IC0323 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $984 | $6,680 | n/a |
IC0323 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $130 | $288 | n/a |
IC0323 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $549 | $2,512 | n/a |
IC0323 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $6,567 | $6,783 | n/a |
IC0323 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $497 | $1,045 | n/a |
IC0323 # 06 Y:2025 | 06 | 2025 | REPLACE BOILER | $5,000 | $39,055 | n/a |
IC0322 # 01 Y:2025 | 01 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $102,930 | $45,500 | n/a |
IC0322 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,000 | $1,250 | n/a |
IC0322 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,262 | $24,421 | n/a |
IC0322 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,041 | $210 | n/a |
IC0322 # 02 Y:2025 | 02 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $5,455 | $41,668 | n/a |
IC0322 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,658 | $693 | n/a |
IC0322 # 10 Y:2025 | 10 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,536 | $2,000 | n/a |
IC0322 # 03 Y:2025 | 03 | 2025 | INCREASE AMOUNT OF CONDENSATE RETURNED | $36,404 | $43,673 | n/a |
IC0322 # 08 Y:2025 | 08 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $4,457 | $211 | n/a |
IC0322 # 09 Y:2025 | 09 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,919 | $0 | n/a |
IC0322 # 11 Y:2025 | 11 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $205 | $144 | n/a |