IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0072 # 02 Y:1996 02 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,206 $0 Implemented
KG0072 # 03 Y:1996 03 1996 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,396 $1,500 Implemented
KG0072 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,330 $25 Implemented
KG0072 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,255 $1,900 Not Implemented
KG0072 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $966 $150 Not Implemented
KG0072 # 07 Y:1996 07 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $955 $0 Not Implemented
KG0072 # 08 Y:1996 08 1996 REDUCE SCRAP PRODUCTION $21,888 $2,000 Not Implemented
KG0056 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,569 $2,370 Implemented
KG0056 # 02 Y:1996 02 1996 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,002 $600 Implemented
KG0056 # 03 Y:1996 03 1996 INSTALL TIMERS AND/OR THERMOSTATS $507 $150 Not Implemented
KG0056 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $421 $20 Not Implemented
KG0056 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $107 $39 Implemented
KG0056 # 06 Y:1996 06 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,088 $400 Not Implemented
KG0056 # 07 Y:1996 07 1996 RECOVER AND REUSE WASTE MATERIAL $6,750 $20,000 Not Implemented
KG0071 # 01 Y:1996 01 1996 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $134,608 $2,000,000 Not Implemented
KG0071 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $33,535 $15,675 Implemented
KG0071 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,966 $37,100 Implemented
KG0071 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,406 $12,000 Not Implemented
KG0071 # 05 Y:1996 05 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $722 $1,230 Implemented
KG0071 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $467 $194 Implemented
KG0071 # 07 Y:1996 07 1996 REDUCE SCRAP PRODUCTION $414,056 $1,500 Implemented
KG0071 # 08 Y:1996 08 1996 RECYCLE WHITE WATER $27,769 $2,930 Implemented
KG0069 # 01 Y:1996 01 1996 AIR CONDITION ONLY SPACE NECESSARY $12,760 $1,150 Not Implemented
KG0069 # 02 Y:1996 02 1996 AVOID FROST FORMATION ON EVAPORATORS $6,712 $2,000 Not Implemented
KG0069 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $2,320 $325 Not Implemented