IAC Assessment: KG0071
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0071
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1996
Principal Product Cotton seed oil, lint meal, and hull
NAICS n/a
SIC 2074 - Cottonseed Oil Mills
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 0
Annual Production 90,000 Tons
Production Hrs. Annual 7,920
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $531,578 9,892,732 kWh $0.05
Electricity Demand $261,234 20,277 kW-months/year $12.88
Electricity Fees $9,097 - $ -
TOTAL ENERGY COSTS $1,243,734
RECOMMENDED SAVINGS* $641,529 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $503,515
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$134,608
Cost:
$2,000,000
$327,304 14,400,645 - - $(-192,696) (-57,350) - - - - $327,304
14,400,645
kWh
-
-
kW-months/year
$(-192,696)
(-57,350)
MMBtu
-
-
Tgal
-
-
lb
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$33,535
Cost:
$15,675
$17,876 732,708 $15,659 1,110 - - - - - - $17,876
732,708
kWh
$15,659
1,110
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$26,966
Cost:
$37,100
$14,718 603,165 $12,248 868 - - - - - - $14,718
603,165
kWh
$12,248
868
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,406
Cost:
$12,000
$3,119 58,910 $287 20 - - - - - - $3,119
58,910
kWh
$287
20
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$722
Cost:
$1,230
$722 29,601 - - - - - - - - $722
29,601
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$467
Cost:
$194
$467 7,327 - - - - - - - - $467
7,327
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
07: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$414,056
Cost:
$1,500
- - - - - - - - $414,056 4,153,270 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$414,056
4,153,270
lb
08: 3.5131 RECYCLE WHITE WATER Savings:
$27,769
Cost:
$2,930
- - - - - - $27,769 1,673,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$27,769
1,673,000
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$641,529
Cost:
$2,070,629
$364,206 15,832,356 $28,194 1,998 $(-192,696) (-57,350) $27,769 1,673,000 $414,056 4,153,270 $364,206
15,832,356
kWh
$28,194
1,998
kW-months/year
$(-192,696)
(-57,350)
MMBtu
$27,769
1,673,000
Tgal
$414,056
4,153,270
lb
TOTAL IMPLEMENTED Savings:
$503,515
Cost:
$58,629
$33,783 1,372,801 $27,907 1,978 - - $27,769 1,673,000 $414,056 4,153,270 $33,783
1,372,801
kWh
$27,907
1,978
kW-months/year
-
-
MMBtu
$27,769
1,673,000
Tgal
$414,056
4,153,270
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)