IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0084 # 05 Y:1997 05 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $22,469 $7,757 n/a
KG0084 # 04 Y:1997 04 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $33,600 $12,995 n/a
KG0084 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,635 $6,140 n/a
KG0084 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,366 $1,022 n/a
KG0084 # 01 Y:1997 01 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,940 $0 n/a
KG0083 # 09 Y:1997 09 1997 MOVE PRODUCT USING MECHANICAL MEANS $1,989 $1,500 n/a
KG0083 # 08 Y:1997 08 1997 MOVE PRODUCT USING MECHANICAL MEANS $819 $2,275 n/a
KG0083 # 07 Y:1997 07 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $300 $0 n/a
KG0083 # 06 Y:1997 06 1997 REDUCE SCRAP PRODUCTION $40,782 $0 n/a
KG0083 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,448 $0 n/a
KG0083 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $228 $25 n/a
KG0083 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $544 $3,050 n/a
KG0083 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,414 $1,207 n/a
KG0083 # 01 Y:1997 01 1997 LOWER CEILING TO REDUCE CONDITIONED SPACE $3,168 $400 n/a
KG0082 # 09 Y:1997 09 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $38,025 $0 n/a
KG0082 # 08 Y:1997 08 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $2,174 $1,079 n/a
KG0082 # 07 Y:1997 07 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $5,525 $0 n/a
KG0082 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $15,960 $0 n/a
KG0082 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $823 $600 n/a
KG0082 # 04 Y:1997 04 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,210 $2,650 n/a
KG0082 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,669 $604 n/a
KG0082 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,010 $14,000 n/a
KG0082 # 01 Y:1997 01 1997 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $9,336 $250 n/a
KG0081 # 07 Y:1997 07 1997 INSTALL BACK-UP EQUIPMENT $3,964 $500 n/a
KG0081 # 06 Y:1997 06 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,100,000 $450 n/a