IAC logo
IAC Assessment: KG0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1997
Principal Product Soft plastic tubes and small hard plastics parts for kidney
NAICS n/a
SIC 3842 - Surgical Appliances And Supplies
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 100,000
Annual Production 16,000,000 Pieces
Production Hrs. Annual 5,880
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,297 4,254,982 kWh $0.03
Electricity Demand $132,159 9,230 kW-months/year $14.32
Electricity Fees $3,685 - $ -
TOTAL ENERGY COSTS $1,490,456
RECOMMENDED SAVINGS* $894,010 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$28,940
Cost:
-
- - - - $28,940 - - - - - -
-
kWh
-
-
kW-months/year
$28,940
-
$
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,366
Cost:
$1,022
$2,648 93,200 $2,718 192 - - - - - - $2,648
93,200
kWh
$2,718
192
kW-months/year
-
-
$
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,635
Cost:
$6,140
$2,123 74,736 $1,512 107 - - - - - - $2,123
74,736
kWh
$1,512
107
kW-months/year
-
-
$
-
-
lb
-
-
$
04: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$33,600
Cost:
$12,995
- - - - - - $33,600 840,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
$33,600
840,000
lb
-
-
$
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$22,469
Cost:
$7,757
- - - - - - $22,469 243,750 - - -
-
kWh
-
-
kW-months/year
-
-
$
$22,469
243,750
lb
-
-
$
06: 4.113 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT Savings:
$800,000
Cost:
-
- - - - - - - - $800,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$800,000
-
$
TOTAL RECOMMENDED Savings:
$894,010
Cost:
$27,914
$4,771 167,936 $4,230 299 $28,940 - $56,069 1,083,750 $800,000 - $4,771
167,936
kWh
$4,230
299
kW-months/year
$28,940
-
$
$56,069
1,083,750
lb
$800,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Primary Product