IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,813

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0044 # 06 Y:1982 06 1982 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $309 $60 Not Implemented
KU0045 # 01 Y:1982 01 1982 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,404 $6,640 Not Implemented
KU0045 # 02 Y:1982 02 1982 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,417 $2,850 Not Implemented
KU0045 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,461 $0 Implemented
KU0045 # 04 Y:1982 04 1982 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,638 $0 Implemented
KU0045 # 05 Y:1982 05 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $659 $200 Implemented
KU0045 # 06 Y:1982 06 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $461 $100 Not Implemented
KU0045 # 07 Y:1982 07 1982 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $547 $0 Implemented
KU0045 # 08 Y:1982 08 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $417 $0 Implemented
KU0038 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,385 $2,427 Not Implemented
KU0038 # 02 Y:1982 02 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $810 $335 Not Implemented
KU0038 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $495 $0 Not Implemented
KU0038 # 04 Y:1982 04 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $300 $400 Not Implemented
KU0038 # 05 Y:1982 05 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $190 $200 Not Implemented
KU0039 # 01 Y:1982 01 1982 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $26,510 $35,000 Not Implemented
KU0039 # 02 Y:1982 02 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $18,206 $7,700 Not Implemented
KU0039 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,081 $2,129 Not Implemented
KU0039 # 04 Y:1982 04 1982 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,511 $3,000 Not Implemented
KU0039 # 05 Y:1982 05 1982 INCREASE EFFICIENCY OF TRUCKS $9,000 $0 Not Implemented
KU0039 # 06 Y:1982 06 1982 RECOVER WASTE HEAT FROM EQUIPMENT $7,569 $25,000 Not Implemented
KU0039 # 07 Y:1982 07 1982 INSTALL TIMERS AND/OR THERMOSTATS $6,940 $100 Not Implemented
KU0040 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,624 $6,466 Not Implemented
KU0040 # 02 Y:1982 02 1982 RECOVER WASTE HEAT FROM EQUIPMENT $4,812 $12,000 Not Implemented
KU0040 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $118 $180 Not Implemented
KU0040 # 04 Y:1982 04 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $332 $0 Not Implemented