IAC logo
IAC Assessment: KU0039
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0039
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1982
Principal Product BOTTLED CARBONATED BEVERAGES
NAICS n/a
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 5,400,000 Pieces
Production Hrs. Annual 2,016
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $170,592 2,840,856 kWh $0.06
Natural Gas $61,477 21,117 MMBtu $2.91
Other Energy $300,266 35,979 MMBtu $8.35
TOTAL ENERGY COSTS $532,335
RECOMMENDED SAVINGS* $77,817 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Electricity Usage Natural Gas Other Energy
$ kWh $ MMBtu $ MMBtu
01: 2.1335 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS Savings:
$26,510
Cost:
$35,000
- - - - $26,510 2,250 -
-
kWh
-
-
MMBtu
$26,510
2,250
MMBtu
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$18,206
Cost:
$7,700
$18,206 303,341 - - - - $18,206
303,341
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$7,081
Cost:
$2,129
- - $7,081 2,434 - - -
-
kWh
$7,081
2,434
MMBtu
-
-
MMBtu
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,511
Cost:
$3,000
$2,511 - - - - - $2,511
-
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.8226 INCREASE EFFICIENCY OF TRUCKS Savings:
$9,000
Cost:
-
- - - - $9,000 1,079 -
-
kWh
-
-
MMBtu
$9,000
1,079
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,569
Cost:
$25,000
- - $7,569 2,610 - - -
-
kWh
$7,569
2,610
MMBtu
-
-
MMBtu
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,940
Cost:
$100
$1,754 29,308 $5,186 1,764 - - $1,754
29,308
kWh
$5,186
1,764
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$77,817
Cost:
$72,929
$22,471 332,649 $19,836 6,808 $35,510 3,329 $22,471
332,649
kWh
$19,836
6,808
MMBtu
$35,510
3,329
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Other Energy Electricity Usage Natural Gas Other Energy