IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,813

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0496 # 02 Y:1998 02 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,940 $8,640 Not Implemented
KU0496 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,850 $7,290 Implemented
KU0496 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,770 $600 Implemented
KU0496 # 05 Y:1998 05 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,760 $1,000 Implemented
KU0496 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,350 $2,900 Implemented
KU0496 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $620 $720 Implemented
KU0496 # 08 Y:1998 08 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $570 $250 Implemented
KU0496 # 09 Y:1998 09 1998 RECOVER WASTE HEAT FROM EQUIPMENT $570 $320 Not Implemented
KU0496 # 10 Y:1998 10 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $520 $250 Not Implemented
KU0496 # 11 Y:1998 11 1998 USE SYNTHETIC LUBRICANT $430 $610 Not Implemented
KU0496 # 12 Y:1998 12 1998 INSULATE BARE EQUIPMENT $290 $440 Not Implemented
KU0496 # 13 Y:1998 13 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $240 $390 Implemented
KU0496 # 14 Y:1998 14 1998 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS $4,260 $420 Not Implemented
KU0495 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,700 $4,100 Not Implemented
KU0495 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,680 $390 Implemented
KU0495 # 03 Y:1998 03 1998 USE SYNTHETIC LUBRICANT $3,080 $2,650 Implemented
KU0495 # 04 Y:1998 04 1998 OPTIMIZE PLANT POWER FACTOR $2,850 $13,260 Not Implemented
KU0495 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,380 $1,490 Implemented
KU0495 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $490 Implemented
KU0495 # 07 Y:1998 07 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $880 $1,000 Not Implemented
KU0495 # 08 Y:1998 08 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $6,770 $7,000 Not Implemented
KU0495 # 09 Y:1998 09 1998 METER WASTE WATER $850 $100 Implemented
KU0495 # 10 Y:1998 10 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $25,200 $33,030 Not Implemented
KU0495 # 11 Y:1998 11 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $22,420 $24,760 Not Implemented
KU0494 # 01 Y:1998 01 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $20,790 $8,520 Implemented