Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,537

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0545 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,580 $1,150 Implemented
KU0545 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,510 $1,770 Implemented
KU0545 # 06 Y:2000 06 2000 COMBINE UTILITY METERS $1,450 $4,000 Implemented
KU0545 # 07 Y:2000 07 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,020 $0 Implemented
KU0545 # 08 Y:2000 08 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $19,600 $11,400 Not Implemented
KU0545 # 09 Y:2000 09 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,530 $3,000 Not Implemented
KU0544 # 06 Y:2000 06 2000 $1,020 $500 Not Implemented
KU0544 # 05 Y:2000 05 2000 $31,200 $2,780 Implemented
KU0544 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $680 $280 Not Implemented
KU0544 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,020 $920 Not Implemented
KU0544 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,390 $840 Implemented
KU0544 # 01 Y:2000 01 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,310 $800 Implemented
KU0543 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $430 $50 Implemented
KU0543 # 01 Y:2000 01 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $27,200 $0 Implemented
KU0543 # 02 Y:2000 02 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,020 $50,000 Not Implemented
KU0543 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $430 $450 Not Implemented
KU0543 # 05 Y:2000 05 2000 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $420 $100 Implemented
KU0543 # 06 Y:2000 06 2000 ELIMINATE A BY-PRODUCT $7,940 $9,680 Not Implemented
KU0543 # 07 Y:2000 07 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,630 $8,000 Not Implemented
KU0543 # 08 Y:2000 08 2000 $56,920 $70,000 Not Implemented
KU0542 # 04 Y:2000 04 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,730 $0 Implemented
KU0542 # 01 Y:2000 01 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,290 $900 Not Implemented
KU0542 # 02 Y:2000 02 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,380 $600 Not Implemented
KU0542 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,010 $330 Implemented
KU0542 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $980 $1,650 Not Implemented