Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 2000 |
Principal Product | power generation equipment |
NAICS | n/a |
SIC | 3621 - Motors And Generators |
Sales | $10,000,000-$50,000,000 |
# of Employees | 225 |
Plant Area (Sq.Ft.) | 129,000 |
Annual Production | 522,000 Units |
Production Hrs. Annual | 6,552 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $145,199 | 3,488,570 | kWh | $0.04 |
Electricity Demand | $96,991 | 12,262 | kW-months/year | $7.91 |
Natural Gas | $13,956 | 7,452 | MMBtu | $1.87 |
TOTAL ENERGY COSTS | $469,315 | |||
RECOMMENDED SAVINGS* | $47,740 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $26,610 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $12,740 Cost: $4,370 |
- | - | - | - | $12,740 | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$12,740 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,420 Cost: $15,470 |
$3,230 | 74,736 | $1,310 | 164 | - | - | - | - | - | - | $(-120) | - | - | - |
$3,230 74,736 kWh |
$1,310 164 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
$(-120) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,890 Cost: $20 |
$2,030 | 43,083 | $860 | 100 | - | - | - | - | - | - | - | - | - | - |
$2,030 43,083 kWh |
$860 100 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,580 Cost: $1,150 |
$1,950 | 39,273 | $630 | 74 | - | - | - | - | - | - | - | - | - | - |
$1,950 39,273 kWh |
$630 74 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,510 Cost: $1,770 |
- | - | - | - | - | - | $1,510 | 809 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$1,510 809 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.8112 COMBINE UTILITY METERS |
Savings: $1,450 Cost: $4,000 |
- | - | $(-6,750) | - | $8,200 | - | - | - | - | - | - | - | - | - |
- - kWh |
$(-6,750) - kW-months/year |
$8,200 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $1,020 Cost: - |
$1,020 | 16,999 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,020 16,999 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $19,600 Cost: $11,400 |
- | - | - | - | - | - | - | - | - | - | - | - | $19,600 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
- - $ |
$19,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $1,530 Cost: $3,000 |
- | - | - | - | - | - | - | - | $1,530 | 104,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$1,530 104,000 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,740 Cost: $41,180 |
$8,230 | 174,091 | $(-3,950) | 338 | $20,940 | - | $1,510 | 809 | $1,530 | 104,000 | $(-120) | - | $19,600 | - | $8,230 174,091 kWh |
$(-3,950) 338 kW-months/year |
$20,940 - $ |
$1,510 809 MMBtu |
$1,530 104,000 lb |
$(-120) - $ |
$19,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $26,610 Cost: $26,780 |
$8,230 | 174,091 | $(-3,950) | 338 | $20,940 | - | $1,510 | 809 | - | - | $(-120) | - | - | - | $8,230 174,091 kWh |
$(-3,950) 338 kW-months/year |
$20,940 - $ |
$1,510 809 MMBtu |
- - lb |
$(-120) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material |