IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,813

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0381 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $322 $0 Implemented
KU0381 # 09 Y:1992 09 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $429 $1,400 Implemented
KU0375 # 01 Y:1992 01 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $16,449 $20,000 Implemented
KU0375 # 02 Y:1992 02 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,970 $525 Implemented
KU0375 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,071 $1,500 Not Implemented
KU0375 # 04 Y:1992 04 1992 RECOVER WASTE HEAT FROM EQUIPMENT $621 $150 Implemented
KU0375 # 05 Y:1992 05 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,252 $0 Not Implemented
KU0375 # 06 Y:1992 06 1992 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,072 $350 Not Implemented
KU0375 # 07 Y:1992 07 1992 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $3,055 $7,752 Not Implemented
KU0375 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $587 $925 Not Implemented
KU0375 # 09 Y:1992 09 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $449 $229 Implemented
KU0375 # 10 Y:1992 10 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $104 $190 Not Implemented
KU0376 # 01 Y:1992 01 1992 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $16,889 $6,000 Not Implemented
KU0376 # 02 Y:1992 02 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,930 $48,000 Not Implemented
KU0376 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,293 $0 Implemented
KU0376 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,251 $0 Implemented
KU0376 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $11,366 $90,000 Not Implemented
KU0376 # 06 Y:1992 06 1992 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,694 $0 Not Implemented
KU0376 # 07 Y:1992 07 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,699 $0 Implemented
KU0376 # 08 Y:1992 08 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,481 $0 Not Implemented
KU0376 # 09 Y:1992 09 1992 INSTALL TURBULATORS $1,195 $1,087 Not Implemented
KU0376 # 10 Y:1992 10 1992 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $2,876 $8,000 Not Implemented
KU0376 # 11 Y:1992 11 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,686 $30,000 Implemented
KU0376 # 12 Y:1992 12 1992 INSULATE BARE EQUIPMENT $4,572 $3,450 Not Implemented
KU0376 # 13 Y:1992 13 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $520 $185 Not Implemented