IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,217

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0190 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,038 $1,510 Implemented
KU0190 # 04 Y:1986 04 1986 IMPROVE LUBRICATION PRACTICES $1,009 $600 Not Implemented
KU0190 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $658 $120 Implemented
KU0190 # 06 Y:1986 06 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $673 $10 Implemented
KU0190 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $249 $50 Implemented
KU0190 # 08 Y:1986 08 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $207 $0 Implemented
KU0191 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,594 $2,592 Implemented
KU0191 # 02 Y:1986 02 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,988 $0 Not Implemented
KU0191 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $423 $100 Implemented
KU0191 # 04 Y:1986 04 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $221 $0 Implemented
KU0191 # 05 Y:1986 05 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $525 $0 Implemented
KU0191 # 06 Y:1986 06 1986 IMPROVE LUBRICATION PRACTICES $151 $138 Not Implemented
KU0187 # 01 Y:1986 01 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,097 $193 Implemented
KU0187 # 02 Y:1986 02 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,550 $2,000 Implemented
KU0187 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $218 $0 Implemented
KU0187 # 04 Y:1986 04 1986 INSTALL AUTOMATIC STACK DAMPER $684 $1,200 Not Implemented
KU0187 # 05 Y:1986 05 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $231 $0 Implemented
KU0187 # 06 Y:1986 06 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $136 $0 Implemented
KU0188 # 01 Y:1986 01 1986 IMPROVE LUBRICATION PRACTICES $13,554 $680 Not Implemented
KU0188 # 02 Y:1986 02 1986 INSTALL SET-BACK TIMERS $2,849 $248 Not Implemented
KU0188 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,183 $900 Implemented
KU0188 # 04 Y:1986 04 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $3,400 $4,600 Implemented
KU0188 # 05 Y:1986 05 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,097 $100 Not Implemented
KU0188 # 06 Y:1986 06 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $255 $0 Not Implemented
KU0182 # 01 Y:1986 01 1986 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $109,167 $1,000,000 Not Implemented