IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,813

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0076 # 03 Y:1983 03 1983 INSTALL AUTOMATIC STACK DAMPER $579 $816 Not Implemented
KU0076 # 04 Y:1983 04 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $498 $200 Implemented
KU0076 # 05 Y:1983 05 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $433 $380 Implemented
KU0077 # 01 Y:1983 01 1983 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $51,514 $55,000 Implemented
KU0077 # 02 Y:1983 02 1983 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $30,320 $0 Implemented
KU0077 # 03 Y:1983 03 1983 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,372 $10,000 Implemented
KU0077 # 04 Y:1983 04 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,586 $1,400 Implemented
KU0077 # 05 Y:1983 05 1983 INSTALL AUTOMATIC STACK DAMPER $4,345 $912 Implemented
KU0077 # 06 Y:1983 06 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,751 $2,228 Implemented
KU0077 # 07 Y:1983 07 1983 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,986 $1,142 Implemented
KU0077 # 08 Y:1983 08 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,716 $550 Implemented
KU0077 # 09 Y:1983 09 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,426 $6,017 Implemented
KU0077 # 10 Y:1983 10 1983 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $2,147 $4,000 Not Implemented
KU0077 # 11 Y:1983 11 1983 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,094 $0 Not Implemented
KU0077 # 12 Y:1983 12 1983 OPTIMIZE PLANT POWER FACTOR $1,735 $970 Not Implemented
KU0077 # 13 Y:1983 13 1983 OPTIMIZE PLANT POWER FACTOR $747 $540 Not Implemented
KU0078 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,695 $1,891 Not Implemented
KU0078 # 02 Y:1983 02 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,257 $167 Implemented
KU0078 # 03 Y:1983 03 1983 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,380 $0 Implemented
KU0078 # 04 Y:1983 04 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $78 Implemented
KU0078 # 05 Y:1983 05 1983 INSTALL AUTOMATIC STACK DAMPER $1,100 $480 Implemented
KU0079 # 01 Y:1983 01 1983 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,862 $0 Not Implemented
KU0079 # 02 Y:1983 02 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,477 $1,800 Not Implemented
KU0079 # 03 Y:1983 03 1983 IMPROVE LUBRICATION PRACTICES $1,453 $300 Not Implemented
KU0079 # 04 Y:1983 04 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $520 $350 Not Implemented