IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

92

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0344 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,057 $1,200 Not Implemented
KU0344 # 03 Y:1991 03 1991 OPTIMIZE PLANT POWER FACTOR $9,087 $19,000 Not Implemented
KU0338 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $4,864 $10,000 Not Implemented
KU0344 # 07 Y:1991 07 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,036 $973 Not Implemented
KU0344 # 01 Y:1991 01 1991 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,104 $9,500 Not Implemented
KU0344 # 08 Y:1991 08 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,696 $5,700 Not Implemented
KU0344 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $13,421 $150,000 Not Implemented
KU0344 # 06 Y:1991 06 1991 INSULATE BARE EQUIPMENT $16,731 $15,811 Not Implemented
KU0338 # 07 Y:1991 07 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $383 $0 Not Implemented
KU0338 # 06 Y:1991 06 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $560 $0 Not Implemented
KU0338 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $695 $0 Not Implemented
KU0338 # 04 Y:1991 04 1991 IMPROVE LUBRICATION PRACTICES $695 $0 Not Implemented
KU0338 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $1,919 $700 Not Implemented
KU0338 # 02 Y:1991 02 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,084 $725 Not Implemented
KU0340 # 03 Y:1991 03 1991 REDUCE VENTILATION AIR $6,174 $100 Not Implemented
KU0340 # 06 Y:1991 06 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $174 $0 Not Implemented
KU0340 # 05 Y:1991 05 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,351 $900 Not Implemented
KU0340 # 04 Y:1991 04 1991 REDUCE VENTILATION AIR $1,042 $350 Not Implemented
KU0340 # 02 Y:1991 02 1991 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $7,689 $200 Not Implemented
KU0340 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $8,570 $0 Not Implemented
KU0343 # 11 Y:1991 11 1991 IMPROVE LUBRICATION PRACTICES $542 $0 Not Implemented
KU0343 # 10 Y:1991 10 1991 ISOLATE HOT OR COLD EQUIPMENT $1,003 $2,180 Not Implemented
KU0343 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $2,448 $2,000 Not Implemented
KU0343 # 03 Y:1991 03 1991 REPAIR AND ELIMINATE STEAM LEAKS $2,793 $400 Not Implemented
KU0343 # 04 Y:1991 04 1991 INSULATE BARE EQUIPMENT $2,239 $4,365 Not Implemented