Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
224
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0419 # 03 Y:1993 | 03 | 1993 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $10,041 | $15,400 | Not Implemented |
KU0419 # 01 Y:1993 | 01 | 1993 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $167,541 | $640,000 | Not Implemented |
KU0419 # 04 Y:1993 | 04 | 1993 | REPAIR AND ELIMINATE STEAM LEAKS | $3,075 | $750 | Implemented |
KU0419 # 02 Y:1993 | 02 | 1993 | INSULATE BARE EQUIPMENT | $4,443 | $2,405 | Not Implemented |
KU0419 # 06 Y:1993 | 06 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,907 | $201 | Not Implemented |
KU0419 # 05 Y:1993 | 05 | 1993 | INSULATE BARE EQUIPMENT | $2,124 | $5,376 | Not Implemented |
KU0419 # 07 Y:1993 | 07 | 1993 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,428 | $1,386 | Implemented |
KU0420 # 01 Y:1993 | 01 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,244 | $12,675 | Not Implemented |
KU0420 # 06 Y:1993 | 06 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $427 | $0 | Not Implemented |
KU0420 # 03 Y:1993 | 03 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $830 | $630 | Implemented |
KU0420 # 07 Y:1993 | 07 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $403 | $512 | Not Implemented |
KU0420 # 04 Y:1993 | 04 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $226 | $113 | Not Implemented |
KU0420 # 05 Y:1993 | 05 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $126 | $30 | Not Implemented |
KU0420 # 02 Y:1993 | 02 | 1993 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,461 | $2,079 | Not Implemented |
KU0418 # 02 Y:1993 | 02 | 1993 | INSTALL OCCUPANCY SENSORS | $1,191 | $1,300 | Not Implemented |
KU0418 # 06 Y:1993 | 06 | 1993 | INSULATE BARE EQUIPMENT | $134 | $293 | Not Implemented |
KU0418 # 05 Y:1993 | 05 | 1993 | USE MINIMUM SAFE OVEN VENTILATION | $538 | $0 | Not Implemented |
KU0418 # 03 Y:1993 | 03 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,422 | $2,228 | Implemented |
KU0418 # 01 Y:1993 | 01 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,404 | $8,420 | Not Implemented |
KU0418 # 04 Y:1993 | 04 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $711 | $668 | Not Implemented |
KU0412 # 06 Y:1993 | 06 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,463 | $8,750 | Not Implemented |
KU0412 # 04 Y:1993 | 04 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,454 | $190 | Implemented |
KU0412 # 07 Y:1993 | 07 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,133 | $20,000 | Not Implemented |
KU0412 # 05 Y:1993 | 05 | 1993 | RECOVER AND REUSE COOLING WATER | $11,879 | $200 | Implemented |
KU0412 # 02 Y:1993 | 02 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $122 | $480 | Implemented |