IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

224

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0419 # 03 Y:1993 03 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $10,041 $15,400 Not Implemented
KU0419 # 01 Y:1993 01 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $167,541 $640,000 Not Implemented
KU0419 # 04 Y:1993 04 1993 REPAIR AND ELIMINATE STEAM LEAKS $3,075 $750 Implemented
KU0419 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $4,443 $2,405 Not Implemented
KU0419 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,907 $201 Not Implemented
KU0419 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $2,124 $5,376 Not Implemented
KU0419 # 07 Y:1993 07 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,428 $1,386 Implemented
KU0420 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $5,244 $12,675 Not Implemented
KU0420 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $427 $0 Not Implemented
KU0420 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $830 $630 Implemented
KU0420 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $403 $512 Not Implemented
KU0420 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $226 $113 Not Implemented
KU0420 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $126 $30 Not Implemented
KU0420 # 02 Y:1993 02 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,461 $2,079 Not Implemented
KU0418 # 02 Y:1993 02 1993 INSTALL OCCUPANCY SENSORS $1,191 $1,300 Not Implemented
KU0418 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $134 $293 Not Implemented
KU0418 # 05 Y:1993 05 1993 USE MINIMUM SAFE OVEN VENTILATION $538 $0 Not Implemented
KU0418 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,422 $2,228 Implemented
KU0418 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,404 $8,420 Not Implemented
KU0418 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $711 $668 Not Implemented
KU0412 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $6,463 $8,750 Not Implemented
KU0412 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,454 $190 Implemented
KU0412 # 07 Y:1993 07 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,133 $20,000 Not Implemented
KU0412 # 05 Y:1993 05 1993 RECOVER AND REUSE COOLING WATER $11,879 $200 Implemented
KU0412 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $122 $480 Implemented