IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,743

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0229 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $5,318 $525 Not Implemented
LE0229 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,100 $4,218 Not Implemented
LE0227 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $101,579 $40,000 Not Implemented
LE0227 # 02 Y:2006 02 2006 REPLACE BOILER $39,147 $143,000 Not Implemented
LE0227 # 03 Y:2006 03 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $18,895 $42,000 Not Implemented
LE0227 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,727 $1,000 Not Implemented
LE0227 # 05 Y:2006 05 2006 $8,000 $7,900 Not Implemented
LE0227 # 06 Y:2006 06 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,005 $500 Not Implemented
LE0227 # 07 Y:2006 07 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,617 $1,200 Not Implemented
LE0222 # 01 Y:2005 01 2005 $96,000 $5,000 Not Implemented
LE0222 # 02 Y:2005 02 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,410 $49,000 Not Implemented
LE0222 # 03 Y:2005 03 2005 $5,760 $5,100 Not Implemented
LE0222 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,048 $2,000 Not Implemented
LE0222 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,793 $815 Not Implemented
LE0222 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,752 $200 Not Implemented
LE0222 # 07 Y:2005 07 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,714 $7,800 Not Implemented
LE0222 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $513 $480 Not Implemented
LE0222 # 09 Y:2005 09 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,823 $500 Not Implemented
LE0224 # 01 Y:2005 01 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $95,556 $262,000 Not Implemented
LE0224 # 02 Y:2005 02 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $35,540 $80,000 Not Implemented
LE0224 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $49,379 $10,700 Not Implemented
LE0224 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $28,953 $4,000 Not Implemented
LE0224 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $20,478 $22,000 Not Implemented
LE0224 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,329 $1,500 Not Implemented
LE0224 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,035 $300 Not Implemented