IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

190

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0286 # 08 Y:2007 08 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $519 $798 Implemented
LL0286 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $602 $420 Not Implemented
LL0286 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,534 $30 Implemented
LL0286 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,588 $920 Implemented
LL0286 # 04 Y:2007 04 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,927 $90 Implemented
LL0286 # 03 Y:2007 03 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,261 $304 Not Implemented
LL0286 # 02 Y:2007 02 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,092 $696 Implemented
LL0286 # 01 Y:2007 01 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,249 $750 Not Implemented
LL0285 # 02 Y:2007 02 2007 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,914 $1,160 Implemented
LL0285 # 01 Y:2007 01 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,109 $60 Implemented
LL0285 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $1,056 $900 Not Implemented
LL0285 # 04 Y:2007 04 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $603 $252 Implemented
LL0285 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $145 $1,734 Not Implemented
LL0285 # 07 Y:2007 07 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $115 $319 Implemented
LL0285 # 08 Y:2007 08 2007 INSULATE BARE EQUIPMENT $99 $81 Not Implemented
LL0285 # 05 Y:2007 05 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $291 $330 Implemented
LL0284 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,900 $1,500 Not Implemented
LL0284 # 01 Y:2007 01 2007 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $52,170 $49,000 Not Implemented
LL0284 # 02 Y:2007 02 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $33,682 $1,600 Not Implemented
LL0284 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,045 $12,575 Not Implemented
LL0284 # 06 Y:2007 06 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,700 $2,074 Not Implemented
LL0284 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,314 $2,100 Not Implemented
LL0284 # 08 Y:2007 08 2007 INSULATE BARE EQUIPMENT $155 $102 Not Implemented
LL0284 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,030 $451 Not Implemented
LL0280 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $287 $30 Implemented