IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,004

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2416 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,502 $3,171 n/a
LS2416 # 03 Y:2024 03 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,195 $6,000 n/a
LS2416 # 04 Y:2024 04 2024 UPGRADE OBSOLETE EQUIPMENT $6,761 $41,925 n/a
LS2415 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $310,598 $83,380 n/a
LS2415 # 02 Y:2024 02 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,098 $41,000 n/a
LS2415 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $37,687 $514,800 n/a
LS2414 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $2,180 $250 n/a
LS2414 # 02 Y:2024 02 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $265,645 $63,000 n/a
LS2414 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,889 $1,050 n/a
LS2414 # 04 Y:2024 04 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $810,158 $2,364,120 n/a
LS2414 # 05 Y:2024 05 2024 REPLACE BOILER $58,575 $420,000 n/a
LS2413 # 01 Y:2024 01 2024 UPGRADE CONTROLS ON COMPRESSORS $68,225 $155,400 n/a
LS2413 # 02 Y:2024 02 2024 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $5,076 $16,000 n/a
LS2413 # 03 Y:2024 03 2024 INSTALL SENSORS TO DETECT DEFECTS $5,700 $30,000 n/a
LS2412 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,703 $150 n/a
LS2412 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $2,908 $275 n/a
LS2412 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $872 $135 n/a
LS2412 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,854 $5,915 n/a
LS2411 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,595 $50 n/a
LS2411 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $266 $45 n/a
LS2411 # 03 Y:2024 03 2024 IMPROVE SPACE COMFORT CONDITIONING $26,395 $18,900 n/a
LS2411 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,962 $12,050 n/a
LS2411 # 05 Y:2024 05 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $72,136 $480,000 n/a
LS0624 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $47,604 $514,800 n/a
LS0624 # 03 Y:2024 03 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,783 $89,810 n/a