Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
864
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT8389 # 03 Y:2023 | 03 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,007 | $5,135 | n/a |
LT8389 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,202 | $9,013 | n/a |
LT8389 # 04 Y:2023 | 04 | 2023 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $2,291 | $0 | n/a |
LT8389 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,009 | $31,373 | n/a |
LT8388 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,799 | $15,210 | n/a |
LT8388 # 03 Y:2023 | 03 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,221 | $9,453 | n/a |
LT8388 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,347 | $7,185 | n/a |
LT8387 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,856 | $0 | n/a |
LT8387 # 03 Y:2023 | 03 | 2023 | REDUCE VENTILATION AIR | $2,819 | $0 | n/a |
LT8387 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,050 | $0 | n/a |
LT8381 # 03 Y:2024 | 03 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,090 | $763 | n/a |
LT8381 # 02 Y:2024 | 02 | 2024 | USE PHOTOCELL CONTROLS | $179 | $176 | n/a |
LT8381 # 05 Y:2024 | 05 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $726 | $480 | n/a |
LT8381 # 04 Y:2024 | 04 | 2024 | REDUCE HEAT GAIN BY WINDOW TINTING | $1,702 | $13,970 | n/a |
LT8381 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,863 | $2,518 | n/a |
LT8382 # 05 Y:2024 | 05 | 2024 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $2,042 | $4,483 | n/a |
LT8382 # 07 Y:2024 | 07 | 2024 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $8,567 | $56,250 | n/a |
LT8382 # 06 Y:2024 | 06 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,120 | $600 | n/a |
LT8382 # 01 Y:2024 | 01 | 2024 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $14,178 | $61,016 | n/a |
LT8382 # 04 Y:2024 | 04 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,755 | $8,100 | n/a |
LT8382 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,368 | $8,172 | n/a |
LT8382 # 03 Y:2024 | 03 | 2024 | USE PHOTOCELL CONTROLS | $731 | $328 | n/a |
LT8377 # 05 Y:2023 | 05 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $5,113 | $47,950 | n/a |
LT8377 # 03 Y:2023 | 03 | 2023 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,486 | $0 | n/a |
LT8377 # 04 Y:2023 | 04 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $43,128 | $221,785 | n/a |