Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
493
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT8382 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,368 | $8,172 | n/a |
LT8382 # 03 Y:2024 | 03 | 2024 | USE PHOTOCELL CONTROLS | $731 | $328 | n/a |
LT8382 # 07 Y:2024 | 07 | 2024 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $8,567 | $56,250 | n/a |
LT8382 # 05 Y:2024 | 05 | 2024 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $2,042 | $4,483 | n/a |
LT8382 # 06 Y:2024 | 06 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,120 | $600 | n/a |
LT8382 # 01 Y:2024 | 01 | 2024 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $14,178 | $61,016 | n/a |
LT8377 # 02 Y:2023 | 02 | 2023 | USE PHOTOCELL CONTROLS | $1,150 | $917 | n/a |
LT8377 # 05 Y:2023 | 05 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $5,113 | $47,950 | n/a |
LT8377 # 04 Y:2023 | 04 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $43,128 | $221,785 | n/a |
LT8377 # 03 Y:2023 | 03 | 2023 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,486 | $0 | n/a |
LT8377 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,663 | $39,769 | n/a |
LT8378 # 01 Y:2023 | 01 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $11,552 | $30,450 | n/a |
LT8378 # 02 Y:2023 | 02 | 2023 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $3,145 | $2,591 | n/a |
LT8378 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $2,353 | $10,050 | n/a |
LT8378 # 03 Y:2023 | 03 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $11,415 | $0 | n/a |
LT8378 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $869 | $864 | n/a |
LT8373 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,033 | $14,614 | n/a |
LT8373 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,264 | $99,888 | n/a |
LT8373 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,015 | $37,491 | n/a |
LT8373 # 06 Y:2023 | 06 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $22,998 | $53,560 | n/a |
LT8373 # 04 Y:2023 | 04 | 2023 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $96,000 | $0 | n/a |
LT8373 # 05 Y:2023 | 05 | 2023 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $24,164 | $0 | n/a |
LT8373 # 01 Y:2023 | 01 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $98,547 | $220,400 | n/a |
LT8372 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,768 | $200 | n/a |
LT8372 # 04 Y:2023 | 04 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $878 | $2,730 | n/a |