Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
884
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT8373 # 06 Y:2023 | 06 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $22,998 | $53,560 | n/a |
LT8373 # 05 Y:2023 | 05 | 2023 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $24,164 | $0 | n/a |
LT8372 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,572 | $255 | n/a |
LT8372 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,621 | $3,316 | n/a |
LT8372 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,768 | $200 | n/a |
LT8372 # 04 Y:2023 | 04 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $878 | $2,730 | n/a |
LT8371 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,997 | $2,973 | n/a |
LT8371 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $69,836 | $1,164,586 | n/a |
LT8371 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,363 | $43,171 | n/a |
LT8371 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $43 | $276 | n/a |
LT8376 # 01 Y:2023 | 01 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $7,532 | $8,500 | n/a |
LT8376 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,255 | $210 | n/a |
LT8376 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,881 | $31,854 | n/a |
LT8374 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $96 | $350 | n/a |
LT8374 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,966 | $9,823 | n/a |
LT8374 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $24,154 | $0 | n/a |
LT8374 # 03 Y:2023 | 03 | 2023 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $30,878 | $16,400 | n/a |
LT8367 # 03 Y:2023 | 03 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,506 | $3,722 | Implemented |
LT8367 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $209 | $343 | Implemented |
LT8367 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $519 | $332 | Not Implemented |
LT8367 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,629 | $335,972 | Implemented |
LT8367 # 01 Y:2023 | 01 | 2023 | TREAT AND REUSE RINSE WATERS | $53,474 | $5,948 | Not Implemented |
LT8366 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,618 | $11,719 | n/a |
LT8366 # 03 Y:2023 | 03 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $18,863 | $61,076 | n/a |
LT8366 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,157 | $4,313 | n/a |