Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
262
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT8413 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,848 | $8,360 | n/a |
LT8413 # 03 Y:2024 | 03 | 2024 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $34,661 | $16,400 | n/a |
LT8413 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $501 | $1,131 | n/a |
LT8413 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,456 | $925 | n/a |
LT8366 # 03 Y:2023 | 03 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $18,863 | $61,076 | Not Implemented |
LT8366 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,157 | $4,313 | Not Implemented |
LT8366 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,618 | $11,719 | Not Implemented |
LT8363 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $5,980 | $10,022 | Not Implemented |
LT8363 # 02 Y:2022 | 02 | 2022 | CHANGE OPERATING CONDITIONS | $46,622 | $0 | Not Implemented |
LT8363 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,542 | $2,945 | Not Implemented |
LT8363 # 04 Y:2022 | 04 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $14,468 | $15,975 | Not Implemented |
LT8363 # 06 Y:2022 | 06 | 2022 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $23,817 | $51,385 | Not Implemented |
LT8363 # 07 Y:2022 | 07 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,254 | $0 | Not Implemented |
LT8363 # 05 Y:2022 | 05 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $22,308 | $32,500 | Not Implemented |
LT0142 # 02 Y:1989 | 02 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,542 | $442 | Implemented |
LT0142 # 03 Y:1989 | 03 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,008 | $442 | Implemented |
LT0142 # 04 Y:1989 | 04 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,470 | $400 | Implemented |
LT0142 # 05 Y:1989 | 05 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $3,092 | $200 | Implemented |
LT0142 # 06 Y:1989 | 06 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,250 | $754 | Not Implemented |
LT0142 # 07 Y:1989 | 07 | 1989 | INSTALL / REPAIR INSULATION ON STEAM LINES | $423 | $100 | Implemented |
LT0142 # 08 Y:1989 | 08 | 1989 | REPAIR AND ELIMINATE STEAM LEAKS | $3,193 | $224 | Implemented |
LT0141 # 04 Y:1989 | 04 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,858 | $1,850 | Implemented |
LT0141 # 01 Y:1989 | 01 | 1989 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $100 | $0 | Implemented |
LT0141 # 02 Y:1989 | 02 | 1989 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $65,980 | $35,000 | Not Implemented |
LT0142 # 01 Y:1989 | 01 | 1989 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $214,983 | $77,904 | Not Implemented |