IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

262

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT8413 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,848 $8,360 n/a
LT8413 # 03 Y:2024 03 2024 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $34,661 $16,400 n/a
LT8413 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $501 $1,131 n/a
LT8413 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,456 $925 n/a
LT8366 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $18,863 $61,076 Not Implemented
LT8366 # 02 Y:2023 02 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,157 $4,313 Not Implemented
LT8366 # 01 Y:2023 01 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,618 $11,719 Not Implemented
LT8363 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $5,980 $10,022 Not Implemented
LT8363 # 02 Y:2022 02 2022 CHANGE OPERATING CONDITIONS $46,622 $0 Not Implemented
LT8363 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,542 $2,945 Not Implemented
LT8363 # 04 Y:2022 04 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $14,468 $15,975 Not Implemented
LT8363 # 06 Y:2022 06 2022 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $23,817 $51,385 Not Implemented
LT8363 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,254 $0 Not Implemented
LT8363 # 05 Y:2022 05 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $22,308 $32,500 Not Implemented
LT0142 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,542 $442 Implemented
LT0142 # 03 Y:1989 03 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,008 $442 Implemented
LT0142 # 04 Y:1989 04 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,470 $400 Implemented
LT0142 # 05 Y:1989 05 1989 INSTALL TIMERS AND/OR THERMOSTATS $3,092 $200 Implemented
LT0142 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,250 $754 Not Implemented
LT0142 # 07 Y:1989 07 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $423 $100 Implemented
LT0142 # 08 Y:1989 08 1989 REPAIR AND ELIMINATE STEAM LEAKS $3,193 $224 Implemented
LT0141 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,858 $1,850 Implemented
LT0141 # 01 Y:1989 01 1989 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $100 $0 Implemented
LT0141 # 02 Y:1989 02 1989 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $65,980 $35,000 Not Implemented
LT0142 # 01 Y:1989 01 1989 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $214,983 $77,904 Not Implemented