IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0453 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $19,476 $45,000 Not Implemented
MA0453 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,766 $19,425 Not Implemented
MA0453 # 05 Y:1999 05 1999 USE LESS WASTEFUL PACKAGING $8,714 $15,000 Not Implemented
MA0453 # 06 Y:1999 06 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,433 $10,115 Not Implemented
MA0452 # 01 Y:1999 01 1999 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $4,467 $7,563 Implemented
MA0452 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,793 $6,075 Not Implemented
MA0452 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $999 $480 Implemented
MA0452 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $891 $400 Not Implemented
MA0452 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $79 $35 Implemented
MA0451 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,798 $50,000 Not Implemented
MA0451 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $3,519 $11,400 Not Implemented
MA0451 # 03 Y:1999 03 1999 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,232 $7,614 Not Implemented
MA0451 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,084 $3,400 Not Implemented
MA0451 # 05 Y:1999 05 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $680 $0 Implemented
MA0451 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $654 $985 Not Implemented
MA0451 # 07 Y:1999 07 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $500 $2,675 Not Implemented
MA0451 # 08 Y:1999 08 1999 ADJUST VENTS TO MINIMIZE ENERGY USE $228 $600 Not Implemented
MA0446 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,897 $36,700 Not Implemented
MA0446 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $30,690 $820 Not Implemented
MA0446 # 03 Y:1999 03 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $14,463 $20,800 Implemented
MA0446 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,237 $3,575 Implemented
MA0446 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,234 $12,279 Not Implemented
MA0446 # 06 Y:1999 06 1999 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,849 $0 Implemented
MA0446 # 07 Y:1999 07 1999 AIR CONDITION ONLY SPACE NECESSARY $1,137 $2,670 Implemented
MA0446 # 08 Y:1999 08 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $930 $4,225 Not Implemented