IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0154 # 05 Y:1989 05 1989 INSULATE BARE EQUIPMENT $395 $757 Not Implemented
MA0154 # 06 Y:1989 06 1989 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,999 $8,160 Not Implemented
MA0147 # 01 Y:1989 01 1989 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $9,019 $15,500 Not Implemented
MA0147 # 02 Y:1989 02 1989 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $182,460 $350,000 Not Implemented
MA0147 # 03 Y:1989 03 1989 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $144 $41 Implemented
MA0147 # 04 Y:1989 04 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,136 $483 Not Implemented
MA0147 # 05 Y:1989 05 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $446 $331 Implemented
MA0147 # 06 Y:1989 06 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,080 $0 Implemented
MA0139 # 01 Y:1988 01 1988 INSTALL TIMERS AND/OR THERMOSTATS $6,928 $2,859 Implemented
MA0139 # 02 Y:1988 02 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,534 $85,000 Implemented
MA0139 # 03 Y:1988 03 1988 OPTIMIZE PLANT POWER FACTOR $19,447 $9,000 Implemented
MA0139 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,222 $3,943 Not Implemented
MA0139 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,467 $72,797 Not Implemented
MA0135 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,462 $359 Implemented
MA0135 # 02 Y:1988 02 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,147 $2,606 Implemented
MA0135 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $380 $70 Not Implemented
MA0135 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $598 $40 Implemented
MA0135 # 05 Y:1988 05 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,736 $1,140 Implemented
MA0135 # 06 Y:1988 06 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,813 $3,320 Not Implemented
MA0135 # 07 Y:1988 07 1988 TURN OFF EQUIPMENT WHEN NOT IN USE $2,525 $0 Implemented
MA0135 # 08 Y:1988 08 1988 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,029 $0 Implemented
MA0125 # 01 Y:1988 01 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,470 $0 Not Implemented
MA0125 # 02 Y:1988 02 1988 INSULATE BARE EQUIPMENT $2,156 $1,143 Not Implemented
MA0125 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $985 $201 Implemented
MA0125 # 04 Y:1988 04 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,614 $18,000 Not Implemented