IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0703 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $3,287 $6,060 Not Implemented
MA0703 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,220 $4,900 Not Implemented
MA0703 # 05 Y:2012 05 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,040 $2,080 Not Implemented
MA0703 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,371 $2,930 Not Implemented
MA0703 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,254 $100 Implemented
MA0703 # 08 Y:2012 08 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $803 $1,200 Not Implemented
MA0703 # 09 Y:2012 09 2012 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $332 $150 Implemented
MAS034 # 01 Y:2012 01 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $19,479 $19,600 Not Implemented
MAS034 # 02 Y:2012 02 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,681 $23,000 Not Implemented
MAS034 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,178 $7,500 Implemented
MAS034 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $760 $1,600 Not Implemented
MAS033 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,549 $7,500 Implemented
MAS033 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,256 $34,000 Not Implemented
MAS033 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $1,224 $730 Not Implemented
MAS033 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $762 $3,450 Not Implemented
MAS032 # 01 Y:2012 01 2012 MODERATE COOLING TOWER OUTLET TEMPERATURE $8,920 $8,000 Not Implemented
MAS032 # 02 Y:2012 02 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,141 $8,000 Not Implemented
MAS032 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,897 $38,000 Not Implemented
MAS032 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,230 $20,000 Not Implemented
MAS032 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $1,008 $730 Not Implemented
MAS032 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $256 $400 Implemented
MA0702 # 01 Y:2012 01 2012 REDUCE FLUID FLOW RATES $11,375 $9,400 Implemented
MA0702 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,144 $1,500 Implemented
MA0702 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,102 $2,210 Not Implemented
MA0702 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $868 $3,000 Implemented