Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,209
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0703 # 01 Y:2012 | 01 | 2012 | OPTIMIZE PLANT POWER FACTOR | $10,588 | $9,425 | Implemented |
MA0703 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,359 | $5,625 | Not Implemented |
MA0703 # 03 Y:2012 | 03 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,287 | $6,060 | Not Implemented |
MA0703 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,220 | $4,900 | Not Implemented |
MA0703 # 05 Y:2012 | 05 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,040 | $2,080 | Not Implemented |
MA0703 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,371 | $2,930 | Not Implemented |
MA0703 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,254 | $100 | Implemented |
MA0703 # 08 Y:2012 | 08 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $803 | $1,200 | Not Implemented |
MA0703 # 09 Y:2012 | 09 | 2012 | TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS | $332 | $150 | Implemented |
MAS034 # 01 Y:2012 | 01 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $19,479 | $19,600 | Not Implemented |
MAS034 # 02 Y:2012 | 02 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,681 | $23,000 | Not Implemented |
MAS034 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,178 | $7,500 | Implemented |
MAS034 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $760 | $1,600 | Not Implemented |
MAS032 # 01 Y:2012 | 01 | 2012 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $8,920 | $8,000 | Not Implemented |
MAS032 # 02 Y:2012 | 02 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,141 | $8,000 | Not Implemented |
MAS032 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,897 | $38,000 | Not Implemented |
MAS032 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,230 | $20,000 | Not Implemented |
MAS032 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $1,008 | $730 | Not Implemented |
MAS032 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $256 | $400 | Implemented |
MAS030 # 01 Y:2012 | 01 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $8,427 | $2,500 | Not Implemented |
MAS030 # 02 Y:2012 | 02 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $5,241 | $1,500 | Not Implemented |
MAS030 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,092 | $0 | Implemented |
MAS030 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,379 | $0 | Implemented |
MAS030 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $2,333 | $4,400 | Not Implemented |
MAS030 # 06 Y:2012 | 06 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,098 | $500 | Not Implemented |