IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,616

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0410 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $2,493 $140 Implemented
MI0410 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,361 $10,695 Implemented
MI0410 # 08 Y:2022 08 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,073 $2,150 Not Implemented
MI0409 # 01 Y:2022 01 2022 USE SOLAR HEAT TO HEAT WATER $24,802 $108,191 Not Implemented
MI0409 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,919 $1,980 Not Implemented
MI0409 # 03 Y:2022 03 2022 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,003 $14,690 Implemented
MI0409 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,496 $240 Not Implemented
MI0409 # 05 Y:2022 05 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,094 $1,885 Implemented
MI0409 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $235 $700 Implemented
MI0409 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $222 $363 Implemented
MI0408 # 01 Y:2022 01 2022 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $21,620 $960 Implemented
MI0408 # 02 Y:2022 02 2022 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $5,828 $2,327 Implemented
MI0408 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,767 $580 Implemented
MI0408 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,972 $120 Implemented
MI0408 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,031 $1,980 Not Implemented
MI0408 # 06 Y:2022 06 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $644 $570 Implemented
MI0407 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,140 $7,899 Implemented
MI0407 # 02 Y:2022 02 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,700 $3,310 Not Implemented
MI0407 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $2,509 $850 Not Implemented
MI0407 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,291 $580 Implemented
MI0407 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,645 $520 Not Implemented
MI0407 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $2,200 Not Implemented
MI0406 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,298 $45,090 Implemented
MI0406 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,075 $5,674 Implemented
MI0406 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,550 $2,031 Implemented