IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,050

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0400 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,855 $11,226 Implemented
MI0400 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $5,931 $3,518 Implemented
MI0400 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,597 $320 Not Implemented
MI0400 # 05 Y:2021 05 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,218 $1,980 Not Implemented
MI0400 # 06 Y:2021 06 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,615 $1,827 Implemented
MI0400 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,897 $1,980 Not Implemented
MI0400 # 08 Y:2021 08 2021 COMBINE UTILITY METERS $2,837 $100 Not Implemented
MI0399 # 01 Y:2021 01 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $115,960 $157,500 Not Implemented
MI0399 # 02 Y:2021 02 2021 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $54,060 $240,000 Implemented
MI0399 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,020 $320 Implemented
MI0399 # 04 Y:2021 04 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $15,245 $70,400 Implemented
MI0399 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,405 $1,670 Implemented
MI0399 # 06 Y:2021 06 2021 METER WASTE WATER $4,166 $900 Not Implemented
MI0399 # 07 Y:2021 07 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,286 $4,468 Implemented
MI0397 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,589 $480 Not Implemented
MI0397 # 02 Y:2021 02 2021 AIR CONDITION ONLY SPACE NECESSARY $2,751 $480 Not Implemented
MI0397 # 03 Y:2021 03 2021 METER WASTE WATER $2,172 $1,380 Not Implemented
MI0397 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $4,555 Not Implemented
MI0397 # 05 Y:2021 05 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,631 $40 Implemented
MI0397 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,361 $40 Implemented
MI0395 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,603 $2,100 Not Implemented
MI0395 # 02 Y:2021 02 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,790 $1,380 Implemented
MI0395 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,523 $1,980 Implemented
MI0395 # 04 Y:2021 04 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,816 $15,328 Not Implemented
MI0395 # 05 Y:2021 05 2021 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $5,744 $26,640 Not Implemented