Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
625
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0159 # 03 Y:2008 | 03 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,615 | $3,475 | Implemented |
MI0159 # 04 Y:2008 | 04 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,266 | $3,978 | Implemented |
MI0159 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,337 | $40 | Implemented |
MI0159 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,238 | $280 | Implemented |
MI0159 # 07 Y:2008 | 07 | 2008 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,875 | $120 | Not Implemented |
MI0159 # 08 Y:2008 | 08 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,521 | $480 | Implemented |
MI0153 # 01 Y:2007 | 01 | 2007 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $342,569 | $290,000 | Not Implemented |
MI0153 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,866 | $54,000 | Not Implemented |
MI0153 # 03 Y:2007 | 03 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,256 | $260 | Not Implemented |
MI0153 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,348 | $1,074 | Not Implemented |
MI0153 # 05 Y:2007 | 05 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $628 | $2,610 | Not Implemented |
MI0152 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,769 | $1,074 | Implemented |
MI0152 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,086 | $724 | Implemented |
MI0152 # 03 Y:2007 | 03 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,314 | $4,000 | Not Implemented |
MI0152 # 04 Y:2007 | 04 | 2007 | PAY BILLS ON TIME TO AVOID LATE FEES | $6,896 | $300 | Implemented |
MI0152 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,287 | $30 | Not Implemented |
MI0152 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,557 | $30 | Not Implemented |
MI0152 # 07 Y:2007 | 07 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,097 | $3,010 | Implemented |
MI0152 # 08 Y:2007 | 08 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $894 | $510 | Implemented |
MI0151 # 01 Y:2007 | 01 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $46,436 | $1,955 | Not Implemented |
MI0151 # 02 Y:2007 | 02 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $67,528 | $120 | Implemented |
MI0151 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,594 | $20,498 | Implemented |
MI0151 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,109 | $1,074 | Implemented |
MI0151 # 05 Y:2007 | 05 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,528 | $3,010 | Not Implemented |
MI0151 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,331 | $30 | Not Implemented |