Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,050
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0323 # 08 Y:2017 | 08 | 2017 | USE SOLAR HEAT TO HEAT WATER | $1,635 | $1,500 | Implemented |
MI0322 # 01 Y:2017 | 01 | 2017 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $1,663,200 | $4,120,000 | Implemented |
MI0322 # 02 Y:2017 | 02 | 2017 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $314,391 | $1,004,370 | Implemented |
MI0322 # 03 Y:2017 | 03 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $171,697 | $338,000 | Implemented |
MI0322 # 04 Y:2017 | 04 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $32,930 | $6,000 | Not Implemented |
MI0322 # 05 Y:2017 | 05 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $31,753 | $112,000 | Not Implemented |
MI0322 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,288 | $72,396 | Implemented |
MI0316 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,732 | $1,660 | Implemented |
MI0316 # 05 Y:2017 | 05 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,995 | $120 | Implemented |
MI0316 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $10,816 | $7,881 | Implemented |
MI0316 # 07 Y:2017 | 07 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,887 | $4,577 | Not Implemented |
MI0316 # 08 Y:2017 | 08 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,115 | $18,100 | Not Implemented |
MI0316 # 09 Y:2017 | 09 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,991 | $2,140 | Implemented |
MI0316 # 10 Y:2017 | 10 | 2017 | USE PHOTOCELL CONTROLS | $4,891 | $4,136 | Not Implemented |
MI0316 # 11 Y:2017 | 11 | 2017 | INSTALL OCCUPANCY SENSORS | $4,454 | $1,280 | Implemented |
MI0316 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,829 | $4,674 | Implemented |
MI0316 # 13 Y:2017 | 13 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,011 | $654 | Implemented |
MI0316 # 01 Y:2017 | 01 | 2017 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $313,428 | $142,400 | Not Implemented |
MI0316 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $72,034 | $39,216 | Implemented |
MI0316 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,854 | $61,030 | Implemented |
MI0314 # 01 Y:2017 | 01 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $8,333 | $6,560 | Implemented |
MI0314 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,727 | $1,660 | Not Implemented |
MI0314 # 03 Y:2017 | 03 | 2017 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,444 | $3,600 | Implemented |
MI0314 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,595 | $12,009 | Implemented |
MI0314 # 05 Y:2017 | 05 | 2017 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $4,033 | $12,706 | Not Implemented |