IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,050

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0218 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $71,478 $47,240 Not Implemented
MI0218 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $53,118 $2,520 Implemented
MI0218 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,712 $21,000 Not Implemented
MI0218 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,901 $1,660 Implemented
MI0218 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,917 $6,660 Not Implemented
MI0218 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,529 $8,200 Not Implemented
MI0218 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,055 $80 Implemented
MI0218 # 09 Y:2012 09 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,885 $13,800 Not Implemented
MI0217 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $18,962 $4,500 Implemented
MI0217 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,605 $39,990 Implemented
MI0217 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,727 $1,300 Implemented
MI0217 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $1,412 $900 Implemented
MI0217 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,064 $1,320 Implemented
MI0217 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $567 $610 Not Implemented
MI0217 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $457 $50 Not Implemented
MI0216 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $7,554 $8,000 Implemented
MI0216 # 02 Y:2012 02 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,307 $8,856 Not Implemented
MI0216 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $3,759 $1,592 Implemented
MI0216 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,170 $1,320 Implemented
MI0216 # 05 Y:2012 05 2012 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $2,128 $500 Implemented
MI0216 # 06 Y:2012 06 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $853 $3,656 Implemented
MI0215 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $15,517 $8,000 Implemented
MI0215 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,090 $1,320 Not Implemented
MI0215 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,007 $21,070 Not Implemented
MI0215 # 04 Y:2012 04 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $6,640 $12,200 Not Implemented