Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0153 # 05 Y:2007 | 05 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $628 | $2,610 | Not Implemented |
MI0153 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,348 | $1,074 | Not Implemented |
MI0153 # 03 Y:2007 | 03 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,256 | $260 | Not Implemented |
MI0153 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,866 | $54,000 | Not Implemented |
MI0153 # 01 Y:2007 | 01 | 2007 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $342,569 | $290,000 | Not Implemented |
MI0152 # 04 Y:2007 | 04 | 2007 | PAY BILLS ON TIME TO AVOID LATE FEES | $6,896 | $300 | Implemented |
MI0152 # 08 Y:2007 | 08 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $894 | $510 | Implemented |
MI0152 # 07 Y:2007 | 07 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,097 | $3,010 | Implemented |
MI0152 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,557 | $30 | Not Implemented |
MI0152 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,287 | $30 | Not Implemented |
MI0152 # 03 Y:2007 | 03 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,314 | $4,000 | Not Implemented |
MI0152 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,086 | $724 | Implemented |
MI0152 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,769 | $1,074 | Implemented |
MI0151 # 01 Y:2007 | 01 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $46,436 | $1,955 | Not Implemented |
MI0151 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,331 | $30 | Not Implemented |
MI0151 # 05 Y:2007 | 05 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,528 | $3,010 | Not Implemented |
MI0151 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,109 | $1,074 | Implemented |
MI0151 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,594 | $20,498 | Implemented |
MI0151 # 02 Y:2007 | 02 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $67,528 | $120 | Implemented |